Solutions
Project & Budget ManagementExpense & Finance TrackingPower Features
PricingFree ToolsBlogAbout UsResources
Open ARC PEMAccount & billingGet started
Home / Glossary / Concrete Mix Ratio (M10, M15, M20, M25)
Glossary

What is the concrete mix ratio for M20, M15 and M10?

A concrete mix ratio gives the proportions of cement, sand and coarse aggregate in a concrete grade. In nominal mixes, M20 is 1 : 1.5 : 3, M15 is 1 : 2 : 4 and M10 is 1 : 3 : 6 by volume.

Concrete Mix Ratio (M10, M15, M20, M25) explained

“M” stands for mix, and the number is the characteristic compressive strength in N/mm² after 28 days of curing — M20 concrete should reach 20 N/mm².

IS 456:2000 allows nominal mixes only up to M20. M25 and stronger grades should be design mixes, proportioned by testing the actual materials as described in IS 10262 (M25 is often quoted as 1 : 1 : 2 for rough estimates).

The dry volume of materials is about 1.54 times the finished wet volume, which is why calculators multiply the volume by roughly 1.54 before splitting it by the ratio.

Example

1 m³ of M20: dry volume ≈ 1.54 m³; cement = 1.54 × 1 ÷ 5.5 ≈ 0.28 m³ ≈ 403 kg ≈ 8 bags of 50 kg.

How ARC PEM helps

Work out quantities with the free concrete calculator, then record cement, sand and aggregate purchases as vendor bills against the project in ARC PEM. See all features.

Free tool: Concrete Calculator — Cement bags, sand, aggregate and water needed for any slab, beam, column or footing — M10 to M25 grades.

Frequently asked questions

How many cement bags are needed for 1 cubic metre of M20 concrete?
About 8 bags of 50 kg for a nominal 1 : 1.5 : 3 mix, using a dry-volume factor of 1.54 and cement density of 1,440 kg/m³.
What does M20 mean in concrete?
M20 is a concrete grade whose characteristic compressive strength after 28 days is 20 N/mm². The M stands for mix.

Related terms

Where this fits in your workflow

This tool is free forever. The full app goes much further.

ARC PEM tracks your BOQ, vendor bills, labour attendance, contractor ledgers and GST across every project — live for the whole firm, on any phone or computer.

Explore ARC PEM →
Free Demo · No Credit Card Required

Ready to take control of
your project finances?

Join 30+ architecture and construction firms already using ARC PEM to track budgets, manage vendors, and generate professional reports — without a single spreadsheet.

Start your plan
RKAS+30
★★★★★
Rated 4.9 / 5 · 30+ teams
Bank-grade SecurityEncrypted, isolated per firm
Monthly or annualAuto-renews · cancel anytime
+91-8810235570Talk to sales · Mon–Sat
info@arcpem.comWe reply within 24 hours
Get Started Free →View Pricing