Home / Glossary / Bill of Quantities (BOQ)
Glossary

What is a Bill of Quantities (BOQ)?

A Bill of Quantities (BOQ) is an itemised list of every material, labour and work item a construction project needs, with the unit, quantity and rate of each, so the project’s cost can be estimated, tendered and controlled.

Bill of Quantities (BOQ) explained

A BOQ is prepared from the drawings and specifications, usually by the architect, a quantity surveyor or an estimator. Each line describes one item of work — for example PCC in foundations, brickwork in cement mortar or vitrified tile flooring — with its unit of measurement (cum, sqm, rmt, kg or nos), quantity, rate and amount.

Contractors price the BOQ when they bid, so bids can be compared line by line. Once work starts, the BOQ becomes the project budget: contractor and vendor bills are checked against its quantities and rates, and anything beyond it shows up as a variation.

In India, BOQ item descriptions often follow the CPWD Delhi Schedule of Rates (DSR) or a state PWD schedule, with GST added on the total.

Example

Illustrative line: “Brickwork in cement mortar 1:6 · Unit: cum · Quantity: 42 · Rate: ₹6,800 · Amount: ₹2,85,600.”

How ARC PEM helps

ARC PEM builds each project’s budget from a BOQ, with reusable BOQ templates and cost per sq ft, contingency and GST computed automatically. Vendor bills, labour wages, contractor bills and site expenses are then tracked against it as budget vs actual, with overrun alerts. See all features.

Free tool: Construction Cost Calculator — Estimate the cost of building a house in India — per sq ft rates by quality and city, with a full cost breakdown and material quantities.

Frequently asked questions

Who prepares a BOQ?
Usually the architect, a quantity surveyor or the client’s estimator, working from the drawings and specifications. Contractors then price it when they bid.
What is the difference between a BOQ and an estimate?
An estimate is the overall expected cost, often a rough figure such as a rate per sq ft. A BOQ is the item-by-item breakdown of quantities and rates behind that cost, and it is what tenders and bills are checked against.

Related terms

Where this fits in your workflow

This tool is free forever. The full app goes much further.

ARC PEM tracks your BOQ, vendor bills, labour attendance, contractor ledgers and GST across every project — live for the whole firm, on any phone or computer.

Explore ARC PEM →
Free Demo · No Credit Card Required

Ready to take control of
your project finances?

Join 30+ architecture and construction firms already using ARC PEM to track budgets, manage vendors, and generate professional reports — without a single spreadsheet.

Start your plan
RKAS+30
★★★★★
Rated 4.9 / 5 · 30+ teams
Bank-grade SecurityEncrypted, isolated per firm
Monthly or annualAuto-renews · cancel anytime
+91-8810235570Talk to sales · Mon–Sat
info@arcpem.comWe reply within 24 hours
Get Started Free →View Pricing